Koorlong Waste Water Treatment Plant Augmentation 2009 - 2010

Principle Contractor: Fulton Hogan

Client: Lower Murray Water

Connection to existing rising main at inlet works

Centrate Pump Station Floor

Inlet Works to SBR

Installation of Plastiline Concrete Pipe

Junction Pit SBR Pipelines and Plastiline Pipes

Site Meeting

Sludge Lagoon Erosion Mattress

Supernatant and Centrate Pipelines

WAS Pipelines

Choose from the selections above or click an area of interest below.

Topcon GPS .:.click the picture to access details and images.

click to read more about our TopCon GPS

contact us       

Talk:+61 3 5022 2070.
Fax: +61 3 5022 7003.
Post: PO Box CP1365
          Mildura Plaza, VIC 3501

Please contact us to discuss your requirements .

Capogreco Excavations are Systems Certified